Rio Rancho, NM

Application

Wastewater Treatment

Construction Date

2016

Capacity

2.0 MG (113' ID x 26.60' SWD)

Owner

City of Rio Rancho, NM

Consulting Engineering

Huitt-Zollars Inc.

The aquifer injection and purified water project includes this two-million-gallon concrete tank for storing untreated water and a building equipped with advanced water treatment equipment to clean the water which will then be pumped into the City’s aquifer.

The project is the first of its kind in New Mexico.

Preload, LLC is proud to be a part of such an outstanding, groundbreaking water reuse program!