Project Details

  • Construction Date

    2016

  • Application

    Reclaimed Water Tank

  • Capacity

    2.0 MG (113' ID x 26.60' SWD)

  • Owner

    City of Rio Rancho, NM

  • Consulting Engineer

    Huitt-Zollars Inc.

Project Description

The aquifer injection and purified water project includes this two-million-gallon concrete tank for storing untreated water and a building equipped with advanced water treatment equipment to clean the water which will then be pumped into the City’s aquifer.
The project is the first of its kind in New Mexico.
Preload, LLC is proud to be a part of such an outstanding, groundbreaking water reuse program!